North Carolina Railroads - Waccamaw Coast Line Railroad

Acronym

Year Chartered or Incorporated

Year Line Operational

Year Service Ended

Original Starting Point

Original Ending Point

WCL RR

1994

1994

1995*

Clinton, NC

Clinton, NC


*1995 renamed to Clinton Terminal Railroad.
The Clinton Terminal Railroad operates three and a half miles of switching track at Clinton, North Carolina and connects with CSX Transportation, Inc. The railroad began operations in July of 1994 as the Clinton Division of the Waccamaw Coast Line, and adopted its present name in September, 1995. The operating company is controlled by L. Gray Tuttle.


© 2007 - J.D. Lewis - PO Box 1188 - Little River, SC 29566 - All Rights Reserved